home

Articles

Blog

Books

Tools

Links

FAQ Page


Test Planning Articles and definitions

Compuware Boosts Quality Tools
Compuware, application quality, Compuware Application Reliability Solution, CARS, QACenter Enterprise Edition, test asset, test asset repositories, test management, requirements analysis, optimized testing, ChangePoint, IT governance software, test managent tools, requirements tools
cont366009.htm

Keane Acquires Cresta Testing
Keane, Cresta Testing, Cresta, Cresta Group, IT services, testing strategy, test process, test execution, business requirements, SDLC,
cont329448.htm

test case suite
behaviour,software under test, test cases,process,test analyst, tester, tracking defects,ceremony,test engineers,technician
cont430.htm

Smoke Testing
smoke,confidence,integrated build,testing of hardware,smoking,iteratively,configuration management tools,health check,system,failure,incremental,test technician,tester
cont481.htm

dynamic analysis
process,evaluating,system, component, behaviour,execution, component testing, component evaluation, component behaviou
cont320.htm

domain
set,values,selected, value set,test planning, test cases, test case suite
cont319.htm

N-transitions
N, N sequence, transitions, testing, transition testing
cont371.htm

branch condition combination coverage
branch conditions, coverage meausure, branch, condition, decision, test execution, exercised, test case, test cases, test case suite
cont259.htm

oracle
test mechanism, mechanism, predicted, predicted outcome, predicted outcomes, outcome, actual outcome
cont373.htm

ISEB Practitioner
planning,specification,risk,execution, functional,dynamic,static, documentation,reviews,inspection,syllabus
cont20.htm

test specification
case,coverage,state,input,predicted outcome
cont447.htm

acceptance testing
business, bat, uat,v model, risk, planning, consultancies, functional, non-functional, manual, automated, development, lifecycle,waterfall, inception, elaboration, transition
cont241.htm

Test Plan for 829-1998
829-1998,software,plan,features,pass,fail,criteria,deliverables, staffing,risks,contingencies
cont19.htm

Notes on Test estimation
point analysis, task planning, procedure, estimate, RUP,risk,top-down, bottom-up, inception, Elaboration, test management, iterative, metrics, maturity, test planning, integration
cont17.htm

This sites test plan
test, planning, documentation, log, specification, procedure, log, incident, risk, automated, functional, non-functional, strategy, scope, test planning, software testing
cont14.htm

Test Designer
planning,design,implementation,test plan,test model,test procedures,test coverage,results,effectiveness
cont539.htm

independence
objective,evaluation
cont344.htm

Critical Testing Processes - Reviewed
rex,black,successful,test team manager,processes,documentation, leader
cont486.htm

Test Planning Documentation
specification,design,case,procedure,transmittal
cont18.htm

Test Design documentation
test,design,specification,case,suite,input values,predicted outcome, test plan
cont487.htm

test completion criterion
planned testing,complete
cont433.htm

test environment
hardware,tests,stubs,drivers
cont436.htm

test generator
program,cases,specified
cont439.htm

test plan
planning,independence,environment,measurement,
cont443.htm

input domain
set,all,possible inputs
cont346.htm

data definition P-use coverage
percentage,component, data, data definition, P-use, data definition, component, component testing, test case, test cases, test case suite, p-use pairs,
cont300.htm

data definition C-use pair
computation,value,defined,test,case,suite,exercised, data definition, C-use, C-use pairs, coverage, test case, test cases, test case suite
cont299.htm

data definition C-use coverage
test,case,suite,exercised, data definition, C-use, C-use pairs, coverage, test case, test cases, test case suite
cont298.htm

control flow
execution,sequences, software testing, test execution, program execution, control flow, flow
cont292.htm

predicted outcome
behaviour, predicted, specification, predicted outcome, specified conditions, test planning, testing, software testing
cont388.htm

Reviewing the test plan
test management,IEEE829_1998,design,build,methodology,planning,waterfall,iteratively,risks,test team,tester,scope
cont526.htm

cause-effect graph
graphical representation,inputs, outputs, inputs, stimuli, test cases, BS 7925-1, software testing,BS 7925-1
cont274.htm

CAST
computer,aided,software,testing, software testing tool, test tool, testing tool, automated testing, test automation, computer aided software testing, software tools, BS 7925-1
cont273.htm

bug seeding
Software testing, error seeding, defect, BS 7925-1
cont269.htm

functional test case design
intended,capability, component, component testing, unit testing, analysis, internal workings
cont341.htm

error seeding
intentionally,adding,faults, error seeding, seeding, error, faults, program
cont328.htm

equivalence partition
equivalence, equivalence class, partition, black box testing, black box, Beizer, funcitional testing
cont326.htm

data definition-use pair
data definition, data, definition-use, data-definition, data value, value,
cont304.htm

data definition-use coverage
percentage,component, exercised, data definition, data, data-definition, coverage
cont303.htm

data definition
executable, statement, variable, value
cont302.htm

Other Test Planning pages

1

2

Test Planning tools.

Test Planning books.

Test Planning Links


See our Sarbanes-Oxley compliance, load testing and Financial Glossary pages.
Articles   Books   FAQ Page   home   Jobs   Links   Reviews Page   Tools  
Booklist   books   Measurement   Testing   Tools